This value comes from misreading the 5% of incorrect assignments as 5% of all 1,000 cases = 50 cases. Then 50×4 = 200 min and the non-auto-assigned 100×2 = 200 min give a total of 400 min, and the reduction rate (2,000 − 400) ÷ 2,000 = 80%. However, “of which” refers to 5% of the 900 cases that were auto-assigned = 45 cases, so this reading is wrong.
○イ
正解Before introduction, the assignment time is 1,000 cases/day × 2 min/case = 2,000 min/day. Six months after introduction, out of all 1,000 cases, 90% (900 cases) were auto-assigned successfully at 0 min/case. Of those, 5% were incorrect assignments, i.e., 5% of the 900 cases = 45 cases, which are handled manually and take 4 min/case (45×4 = 180 min). The cases that could not be auto-assigned were 10% (100 cases), handled manually at 2 min/case (100×2 = 200 min). The remaining 855 cases that were correctly auto-assigned take 0 min. Therefore, the total after introduction is 180 + 200 = 380 min/day. The reduction rate is (2,000 − 380) ÷ 2,000 × 100 = 81%, so the correct answer is イ (81).
×Incorrectウ
If the manual handling for incorrect assignments is counted at 2 min/case (the same as the non-auto-assigned cases) instead of the proper 4 min/case, underestimating the manual handling time, the total after introduction becomes about 300 min and the reduction rate becomes 85%. Incorrect assignments should be counted at 4 min/case, so this is an error caused by underestimation.
×Incorrectエ
If the number of cases or minutes handled manually is counted even lower, the total after introduction becomes about 280 min and the reduction rate becomes 86%. Correctly adding the 45 incorrect-assignment cases × 4 min = 180 min and the 100 non-auto-assigned cases × 2 min = 200 min gives 380 min and 81%; 86% is an excessively high reduction rate resulting from undercounting the manual handling time, and is wrong.
ここがポイント
Reduction rate = (total time before introduction − total time after introduction) ÷ total time before introduction × 100. The key point is to accurately sum up the cases × processing time for each category to find the total time.
Of which X% is a ratio relative to the immediately preceding higher-level category (the 900 cases that were auto-assigned), and must not be confused with a ratio relative to the whole (1,000 cases).